Saturday, November 16, 2013

Wait, are those men's boots???

Hi All! We had our official walk through on Thursday. I woke up that morning excited to see the finished product! I have been very busy at school, and now that we have fallen back it gets dark so early that I have not been able to get by the house. We stopped for a  pumpkin muffin (special treat :) ) and a hot cut of coffee and headed to the house. To my surprise, the house was not done! There was a work van sitting outside the house an painters inside when we got there. I thought we had the wrong day! Our PM assured us that the work was 99% done so we continued with the final walk through. The one big this that was missing was our refrigerator. Our PM's assistant forgot to order it and our PM didn't notice it until the night before. He assured us that it would be delivered on Monday, 2 days before closing.

The walk through was VERY informative. There are lots of little features that make the house more efficient and fun to live in. I am VERY happy that we chose Ryan Homes. We close in less than 4 days.... Wow, time has flown by! Enjoy the pics below. :)


Not what I expected to see! :) Belonged to the PM

Living Room

Still working on small touch-up jobs but that's ok

View of main hallway from kitchen

Mud room

View from back door


Master bath shower. This isn't the best pic but I love this shower! Double shower heads! 
Master bath tile


Hallway bath!


 Missing fridge space. Hard to get a good kitchen pic because people were still working.


Dining room




View from master bedroom
 


Laundry room

Garage
Self explanatory :)
.

Tried to get a shot of the entire lot

Looking into back yard. Sod an irrigation front and back! The hubby is happy about that :)




I love this pic! Front porch/stoop :) I love how the brick turned out!

Tuesday, November 5, 2013

The house is a mess...

If you have been wondering why I haven't posted anything in a while its because:

1. Not much has changed in the house. Kitchen still not done, not much change to exterior
2. The house looks a mess! I do not want others to see the house in this condition! I know its not actually ours yet but a girl still takes pride in how her home looks. :)
3. I haven't been able to get many good pictures. Its getting pretty cold here so with no heat in the house visits are a bit rushed.

I have come to grips with the fact that the house will look a mess for another week so I am posting pics anyway. Its a bit frustrating because it seems like they start a lots of things but complete nothing. They have a LOT of work to do before the final walkthrough next week. Btw, notice anything different on the page? We have a countdown!!! It only took me a couple hours to figure out how to add it. :)

Lets just get this over with, the kitchen looks terrible.


They started the repair on that drywall mishap in the kitchen

 

They have started the second round of drywall so time to touch-up imperfections
Oh and carpets done!!! 

Tried to get a pic of the counter for you Angie. Its not the best but I will try again next time

 

Hallway bathroom, still not done
Exterior is pretty much unchanged, still no driveway, yard not graded, light fixture missing, stoop not done.
They did pour the walkway although it is difficult to see in this picture

Saturday, October 26, 2013

Slowly but surely...

I am proud to say that I have been very patient in waiting for the missing louver to be installed. Today when I drove by, 1.5 weeks later, it was fixed!!!! So now the brick is complete. :) They have also installed the siding and shutters and completed the first coat of paint. I was not very happy about the 'cool platinum' color before but I must admit, it looks good. :) They also started installing the cabinets. The company that installed them damaged our drywall but we were assured that would be fixed. They also started on our flooring. It is really coming together!  :)

This was a pleasant surprise! They also delivered some appliances


Looks bad right....


Countertops hanging out in the garage for now


Peek-a-boo! Hardwood in powder room!

View from the front door, kitchen to far left


Master bedroom, color not bad right?


This is how it looks now!!!! Sorry about the sun glare

Close-up of the repair. The mortar is still wet

This is the view from the street. I love it!

Tuesday, October 15, 2013

Wait.... something is missing...

Sorry, I know its been a little while. Lots has happened in the last week or so. They have completed the framing and installed the insulation. We did end up adding our own insulation later that night. The put some up between the office and living room, around the laundry room, the hall bathroom and around our bedroom. We also wrote our inspirational quotes and scriptures on the framing. :) Two days later they started the drywall.

They also starting working on the outside of the house.  :) Brick finally! Yay! We have not had any other problems.... well actually we may be having one soon. Today I noticed that something was missing from the front of the house... a small white circular vent that should be above the windows. Pics below... I have place a picture of the model beside our house for comparison. We will be bringing that up to the PM tomorrow.

Upstairs hallway, looking into master bedroom
 
Room 1
 

Sorry about the poor pic quality, it was late at night an the only light source was a battery powered lantern 
 
Looking up the stairs!

Living room and door to office

Upstairs hallway from master

Brick!!!
 


























UPDATE:

WE WERE RIGHT! They forgot to add the decorative louver before they started the brick. We spoke with our PM about it and he said the brick layers would have to come back out and add it in addition to our decorative brick and keystone that goes around it. He says the repair should be seamless.... It better be... This is similar to what it should look like.   Pretty right?  :)   I will keep you all posted.

Sunday, October 6, 2013

Quick update!

My faith in our PM has been re-established.  :) We met with him on Wednesday and he walked us through the house. He explained that we do have the correct shingles and that the 20 year shingles only went around the roof vents. He took the time to show us the difference between the two which made me feel better. He also explained that the mistakes in the master bedroom and bathroom were being corrected. Most of it had already been corrected by that time. He assured us that it should not push back the finish date. He also agreed to meet with us at the house weekly for updates.

All in all, I trust his ability to do his job well. I will STILL keep my eyes on EVERYTHING, but I will try not to freak out so quickly :)

Coming up next is insulation and then drywall! The hubby and I are compiling a list of scriptures and inspirational quotes to write on the frame beams before the drywall goes up. Oh, and we are also getting ready for the small widow of opportunity to insulate the inside wall. We plan to do the master bedroom, hall bath, laundry room, and office. Will post pics soon!

Sunday, September 29, 2013

Smh... I don't know what else to do...



SO, we went by the house today excited about seeing more progress. There were no workers around so we decided to sneak a peak inside. Framing is completely done now, the roof is on, AC ducts have been installed, plumbing has started.. not sure if they have completed it yet.

Although we are happy about the progress, we have found several mistakes. First, remember that extra window that was in the master bathroom? The one that was for a different bathroom layout that was patched up? Well, unfortunately the square footage in the bedroom was suppose to increase with the bathroom layout we have. It has not. So, they patched the window hole but did not move the wall. Pics posted below to explain it better.  We also noticed that the plumbing in the master bath was only on one side of the shower. We should have two shower heads, one on each side.

Incorrect layout with smaller master bedroom, note the extra window in the master bath

Correct layout with larger master bedroom

Last but not least. We are suppose to have the upgraded 30 year warranty roof shingles. This is a photo of some leftover shingles that was laying on the ground.  


The hubby is pretty pissed and so am I. This is too many mistakes to be so early in the progress. Now they have to move walls, patch holes, and redo plumbing and AC ducts... That may mean closing later.... Smh... We have requested a meeting with our PM at the house ASAP. I don't want to feel like I am bothering him but we keep finding things!